PRA
Filter
Batching Plant
Block/Brick/Plaster/Safety Work
Casting N etc
Chipping/Core Cutting/Rebaring
Electrical
Fabrication Work
False Ceiling
Fire / Water Proofing
MISC
Painting
Plumbing
Reinforcement
Scaffolding
Shuttering
Tiles/Granite/Stones
Wooden/UPVC Work
Batching Plant
SrN
Title
Rate
1
Pump and pipe line work on contract ; ID: 360
90000/month;
24 hrs working as when required. Approx team size of 5-6 Person.
Block/Brick/Plaster/Safety Work
SrN
Title
Rate
2
Interlocking Paved Block Fixing; ID: 695
10.22/sqft;
Making footway by locking brick block. 110/sqm
SrN
Title
Rate
3
Plaster-Kaccha ; ID: 700
7/sqft;
SrN
Title
Rate
4
Safety Net Fixing Internal ; ID: 172
400/each;
SrN
Title
Rate
5
Block Work 100mm ; ID: 160
12/sqft;
Add 3% per Floor from 1st Floor.
SrN
Title
Rate
6
Steel Shuttering and RCC Over Block 100mm; ID: 161
100/rft;
Laying reinforcement steel shuttering and RCC over Block work
SrN
Title
Rate
7
Steel Shuttering and RCC Over Block 200mm; ID: 162
125/rft;
SrN
Title
Rate
8
Red Brick Work 100mm; ID: 163
12/sqft;
Add 3% per Floor from 1st Floor.
SrN
Title
Rate
9
Red Brick Work 230mm; ID: 165
13/sqft;
Add 3% per Floor from 1st Floor.
SrN
Title
Rate
10
Plaster External Work (Single Coat); ID: 167
150/sqm;
SrN
Title
Rate
11
Safety net fixing outer side to G+2 Duplex; ID: 247
400/each;
SrN
Title
Rate
12
Safety Work - Net Removing G+2 Side; ID: 749
200/each;
SrN
Title
Rate
13
Plaster - Extra Beam Groove ; ID: 731
42/rmt;
SrN
Title
Rate
14
Plaster - External Groove; ID: 740
59/rmt;
SrN
Title
Rate
15
Block Work 200mm ; ID: 725
13/sqft;
Add 3% per Floor from 1st Floor.
SrN
Title
Rate
16
Tapak (balcony); ID: 1103
6/ft;
SrN
Title
Rate
17
Block/Brick/Plaster/Safety Work; ID: 1104
12/sqft;
SrN
Title
Rate
18
Gypsum Plaster without Material; ID: 1124
13/sqft;
SrN
Title
Rate
19
Internal Plaster; ID: 1239
80/sqm;2.5%
Add 2.5 % per Floor from 1st Floor.
SrN
Title
Rate
20
Boundry Wall Plaster; ID: 1293
90.76/sqm;
Casting N etc
SrN
Title
Rate
21
Kitchen Complete Slab Upto Casting; ID: 696
1000/each;
Includes Shuttering , Reinforcement and Casting
SrN
Title
Rate
22
Lintel Fixing; ID: 697
225/each;
Used above Door and Window
Chipping/Core Cutting/Rebaring
SrN
Title
Rate
23
Rebaring, Steel 10mm; ID: 568
70/Pc;
Pc represent number of Steal.
SrN
Title
Rate
24
Rebaring, Steel 12mm; ID: 597
105/pc;
SrN
Title
Rate
25
Rebaring, Steel 20mm; ID: 599
255/pc;
SrN
Title
Rate
26
Core Cutting in Beam and filing; ID: 355
500/each;
SrN
Title
Rate
27
Core cutting in RCC slab; ID: 358
250/each;
SrN
Title
Rate
28
Rebaring, Steel 25mm; ID: 691
310/pc;
SrN
Title
Rate
29
Rebaring, Steal 32mm; ID: 703
860/pc;
SrN
Title
Rate
30
Core Cutting; ID: 714
800/each;
SrN
Title
Rate
31
Core Filling; ID: 716
40/each;
For Pappu Rai, Rs 50/each.
SrN
Title
Rate
32
Kutch Cutting; ID: 250
17/rmt;
SrN
Title
Rate
33
Beam Cutting up to 25mm thick; ID: 251
130/sqm;
SrN
Title
Rate
34
Hacking RCC Column And Shear Wall; ID: 252
5/sqm;
SrN
Title
Rate
35
Water Proofing; ID: 259
165/sqm;
Water proffing Tapecreat as per standard specification including protecting coat af plaster including pipe plaster
SrN
Title
Rate
36
Beam Core Cutting (185x200 mm); ID: 775
550/each;
SrN
Title
Rate
37
Rebaring, Steal 16mm; ID: 751
190/each;
SrN
Title
Rate
38
Rebaring, Steal 8mm; ID: 769
40/pc;
SrN
Title
Rate
39
Core cutting in Beam for AC; ID: 1282
400/each;
SrN
Title
Rate
40
Washbasin Counter Hole; ID: 1292
100/pc;
Electrical
SrN
Title
Rate
41
Ro Fitting; ID: 888
250/each;
SrN
Title
Rate
42
Testing & handover; ID: 1116
2000/flat;
For T-05 & 06 Only
SrN
Title
Rate
43
Earthing Cable; ID: 1117
20/mt;
SrN
Title
Rate
44
Basement electrical conduit with wiring; ID: 1118
9.5/mt;
SrN
Title
Rate
45
Electrical panel box complete work; ID: 1119
3000/each;
SrN
Title
Rate
46
Outside Flat. Shaft and Panel Room; ID: 1120
37500/each;
Electrical Work of each Flat in electrical shaft and panel rooms (outside Flat)
SrN
Title
Rate
47
Lift Complete electrical work; ID: 1121
10000/each;
SrN
Title
Rate
48
LED Bulb Fixing; ID: 745
50/each;
SrN
Title
Rate
49
Geyser Fitting; ID: 841
280/each;
SrN
Title
Rate
50
Window ac fitting; ID: 842
350/each;
SrN
Title
Rate
51
Split ac fitting; ID: 843
1000/each;
SrN
Title
Rate
52
FAN FITTING; ID: 436
90/Each;
SrN
Title
Rate
53
DB Fixing; ID: 113
500/each;
SrN
Title
Rate
54
Slab Conduiting ; ID: 174
3/sqft;
SrN
Title
Rate
55
Conduit down opening and fish wire 5% of Rs 15; ID: 175
0.75/sqft;
SrN
Title
Rate
56
Wall Conduiting 25% of Rs 15; ID: 178
3.75/sqft;
SrN
Title
Rate
57
Wireing 25% of Rs 15; ID: 179
3.75/sqft;
SrN
Title
Rate
58
Switch and Socket Fixing 20% of Rs 15; ID: 181
3/sqft;
SrN
Title
Rate
59
Testing Hand Over 5% of Rs 15; ID: 183
0.75/sqft;
SrN
Title
Rate
60
Surface Panel Light Fixing; ID: 1290
65/pc;
SrN
Title
Rate
61
Electical Shaft to FLat MCB Connection; ID: 1304
750/FLat;
Its also part of area based costing.
SrN
Title
Rate
62
Eathernet/Camera Cable Wiring; ID: 1306
20/mtr;
SrN
Title
Rate
63
Boundry Wall Light fixing with wiring; ID: 1308
1200/pc;
Initially given by Satender Rs 4400. Then, done by maintenance team and based on that rate finalized.
SrN
Title
Rate
64
Fancy Pole Light Fixing with Wiring; ID: 1309
2000/Pole;
Our pole height: has two lights.
Fabrication Work
SrN
Title
Rate
65
Steel Cutting with Gas Cylender ; ID: 699
7/kg;
SrN
Title
Rate
66
Chair Making for Plaster and Paint; ID: 709
5/kg;
SrN
Title
Rate
67
Chair Repairing ; ID: 710
50/each;
SrN
Title
Rate
68
Railing Making; ID: 195
12/kg;
SrN
Title
Rate
69
MS Railing Repair (not in size & shape); ID: 196
200/each;
SrN
Title
Rate
70
Refixing of existing railing including fasterner; ID: 197
200/each;
Removing Repairing refixing of existing fixed railing including fixing of fasterner after making fixing M.S cleat
SrN
Title
Rate
71
Fixing MS Pipes and GI Sheet for Hutment; ID: 198
13/sqft;
Febrication and fixing M.S pipes and Gi sheet for hutment both horizontal and vertical shall be measured
SrN
Title
Rate
72
PIN Patti Making ; ID: 242
15/kg;
SrN
Title
Rate
73
Chali Making; ID: 245
12/kg;
SrN
Title
Rate
74
Column Framing; ID: 116
10/kg;
SrN
Title
Rate
75
Stair Case Railing; ID: 118
500/rmt;
!0% Add on for T1
SrN
Title
Rate
76
Hand Railing Work; ID: 123
200/each;
SrN
Title
Rate
77
Cutting, Welding and fixing Steel Mesh in Shaft; ID: 345
6/kg;
Cutting welding and fixing steel mesh in shaft including welding rod at all height
SrN
Title
Rate
78
Shaft Steel Mesh Making ; ID: 755
200/each;
SrN
Title
Rate
79
ISMB Fixing Two Lifts in Tower; ID: 885
5000;
For Both Lift
SrN
Title
Rate
80
Prop Jack Repair; ID: 1095
20/each;
SrN
Title
Rate
81
Chair (Ghori) making; ID: 1096
100/each;
SrN
Title
Rate
82
Steel bar cutting all dia; ID: 1097
4/Each;
SrN
Title
Rate
83
MS Fixing work; ID: 1098
4/Kg;
SrN
Title
Rate
84
Kenda making; ID: 1099
10/each;
SrN
Title
Rate
85
Removing MS pipe & GI sheet; ID: 1100
10/sqft;
SrN
Title
Rate
86
Fixing flanges in OHWT; ID: 1101
100/each;
SrN
Title
Rate
87
Channel Making ; ID: 726
8/kg;
SrN
Title
Rate
88
Counter Angle Making & Fixing; ID: 717
50/each;
SrN
Title
Rate
89
MS Gate Fixing; ID: 789
700/each;
SrN
Title
Rate
90
Railing Fixing All Sizes; ID: 945
115/rmt;
SrN
Title
Rate
91
Baricading MS Jali Fixing ; ID: 1310
40/sqft;
First time done for transformer area. Fabricator demanded Rs 40, but Ajay finalized on Rs 40.
SrN
Title
Rate
92
Fancy Pole Fixing for Street Light; ID: 1311
3000/pc;
Rate Finalized by Ajay and Neeraj.
False Ceiling
SrN
Title
Rate
93
Grid False Ceiling Without Material Fixed; ID: 1123
535/Toilet;
SrN
Title
Rate
94
Grid False Ceiling with Material; ID: 690
50/sqft;
SrN
Title
Rate
95
Gypsum Plaster; ID: 741
30/sqft;
SrN
Title
Rate
96
Grid False Ceiling Without Material; ID: 727
10/sqft;
SrN
Title
Rate
97
Grid False ceiling; ID: 1102
650/Toilet;
Labour Rate with no security deduction
Fire / Water Proofing
SrN
Title
Rate
98
Tapecrete Water Proofing Work; ID: 881
181.5/sqft;
Rate modified before
SrN
Title
Rate
99
Brick Bat Coba; ID: 882
25/sqft;
After water proofing on roof. We place piece of brick and then do Plaster.
SrN
Title
Rate
100
Injection Nipple Grouting; ID: 742
165/each;
10% Increment.
MISC
SrN
Title
Rate
101
Excavation Depth 3100mm; ID: 730
2.15/cft;
SrN
Title
Rate
102
Opening Raft ; ID: 886
3000/mt;
Painting
SrN
Title
Rate
103
Door Frame Primer at Store; ID: 1307
60/pc;
It is required because new door frame supplier vendors send door wither primer.
SrN
Title
Rate
104
Writing Quotes on Wall; ID: 1312
36/sqft;
SrN
Title
Rate
105
Wall Primer; ID: 772
1.25/sqft;
SrN
Title
Rate
106
Wall Paint; ID: 773
1.25/sqft;
SrN
Title
Rate
107
Wodden Door Putty ; ID: 719
1/sqft;
SrN
Title
Rate
108
Wodden Door Paint; ID: 887
1.5/sqft;
SrN
Title
Rate
109
Wooden door Shutter Polish; ID: 1105
16/sqft;
SrN
Title
Rate
110
MS Railing Primer 1 Coat; ID: 1106
1/sqft;
SrN
Title
Rate
111
MS Railing Paint 1 Coat; ID: 1107
1.5/sqft;
SrN
Title
Rate
112
External Primer 1 Coat; ID: 1108
1.2/sqft;
SrN
Title
Rate
113
External Paint 1 Coat; ID: 1109
1.4/sqft;
SrN
Title
Rate
114
Laying Wall Putty; ID: 365
1.25/sqft;
Initially Rs 1/sqft
Plumbing
SrN
Title
Rate
115
Toilet PVC Fitting 30% of 4000; ID: 761
1200/each;
SrN
Title
Rate
116
Toilet Water Supply Riser UPVC 10% of 4000; ID: 762
400/each;
SrN
Title
Rate
117
Sink Fixing; ID: 756
400/each;
SrN
Title
Rate
118
Terrace Valve Ball ; ID: 757
120/each;
SrN
Title
Rate
119
Terrace Valve Ball ; ID: 758
80/each;
SrN
Title
Rate
120
Testing Toilet CPVC 10% of 4000; ID: 759
400/each;
SrN
Title
Rate
121
CPVC Work in Toilet 20% of 4000; ID: 777
800/each;
SrN
Title
Rate
122
PVC Internal and External in Kitchen 30% of 2000; ID: 783
600/each;
SrN
Title
Rate
123
Kitchen CPVC Fitting Testing; ID: 785
200/each;
SrN
Title
Rate
124
CPVC in Kitchen 20% of 2000; ID: 786
400/each;
SrN
Title
Rate
125
UPVC Kitchen Water Supply Riser 10% of 2000; ID: 787
200/each;
SrN
Title
Rate
126
CPVC ReWork with Dismanteling of Toilet n Kitchen; ID: 794
2000/each;
SrN
Title
Rate
127
Ring Line Terrace Floor ; ID: 752
90/rmt;
SrN
Title
Rate
128
Laying sewarge line RCC pipe 250mm ; ID: 1112
220/rmt;
SrN
Title
Rate
129
GI pipe fitting 50mm; ID: 1113
100/mt;
SrN
Title
Rate
130
PVC pipe 110mm; ID: 1114
100/mt;
SrN
Title
Rate
131
PVC pipe 160mm; ID: 1115
150/mt;
SrN
Title
Rate
132
Chinaware Fitting Kitchen 30% of 2000; ID: 711
600/each;
SrN
Title
Rate
133
Chinaware Fitting Bathroom 30% of 4000; ID: 712
1200/each;
SrN
Title
Rate
134
UPVC Pipe Boring to UG Tamprary Tank 32mm; ID: 702
20/each;
SrN
Title
Rate
135
RCC Pipe Sewarage 250mm Dia; ID: 698
220/rmt;
SrN
Title
Rate
136
Fixing of PRV; ID: 348
500/each;
SrN
Title
Rate
137
Terrace Ring 100mm DIA; ID: 349
140/rmt;
SrN
Title
Rate
138
Terrace Ring 80mm DIA; ID: 350
120/rmt;
SrN
Title
Rate
139
Terrace Ring 65mm DIA; ID: 352
115/rmt;
SrN
Title
Rate
140
Terrace Ring 40 to 50mm DIA; ID: 354
100/rmt;
SrN
Title
Rate
141
Sewer PVC Pipe Fixing, 200mm; ID: 1291
150/mtr;
Reinforcement
SrN
Title
Rate
142
Reinforcement; ID: 438
6000/mt;
SrN
Title
Rate
143
Reinforcement for Column; ID: 439
6000/mt;
3% Lift Charge from Ground Floor
SrN
Title
Rate
144
Reinforcement for Slab; ID: 925
6000/mt;
3% Lift Charge from Ground Floor
Scaffolding
SrN
Title
Rate
145
Outer scaffolding + descaffolding; ID: 1089
22/sqm;
SrN
Title
Rate
146
Outer scaffolding; ID: 1090
13/sqm;
SrN
Title
Rate
147
Outer descaffolding; ID: 1091
9/sqm;
SrN
Title
Rate
148
Scaffolding Fixing and Removing ; ID: 168
19/sqm;
SrN
Title
Rate
149
Scaffolding Tappa With chali fixing ; ID: 171
75/one tappa;
SrN
Title
Rate
150
DE Scaffolding; ID: 477
7/sqm;
SrN
Title
Rate
151
Scaffolding Fixing Only ; ID: 693
12/sqm;
Shuttering
SrN
Title
Rate
152
Shuttering For Column; ID: 924
110/sqm;
2.5% Lift Charge from Ground Floor, Rs 10 Incentive on target base
SrN
Title
Rate
153
Shuttering for Basement/NTA Slab; ID: 370
150/sqm;
Rs 10 Incentive on target base
SrN
Title
Rate
154
Shuttering for Typical Slab; ID: 371
110/sqm;
2.5% Lift Charge from Ground Floor; Rs 10 Incentive on target base
SrN
Title
Rate
155
Shuttering making ; ID: 372
40/sqm;
SrN
Title
Rate
156
Shuttering RE making; ID: 374
50/sqm;
Tiles/Granite/Stones
SrN
Title
Rate
157
Stair Case (Granite), Close; ID: 187
28/sqft;
SrN
Title
Rate
158
Corridor (Granite); ID: 188
29/sqft;2.5%
SrN
Title
Rate
159
Skirting (Granite); ID: 189
24/rft;2.5%
SrN
Title
Rate
160
Chemfering Single Edge; ID: 190
11/rft;
SrN
Title
Rate
161
Fixing Wall Tiles; ID: 191
16/sqft;2.5%
SrN
Title
Rate
162
Fixing Floor Tiles; ID: 192
15/sqft;2.5%
SrN
Title
Rate
163
Kitchen Counter (Granite); ID: 193
37/sqft;2.5%
SrN
Title
Rate
164
Skirting (Tiles); ID: 194
10/rft;2.5%
SrN
Title
Rate
165
Cladding in Lift, Close; ID: 713
60/sqft;
SrN
Title
Rate
166
Door Seal; ID: 729
24/rft;2.5%
Just below door. Also known as Dahal. Initially Rs 22.
SrN
Title
Rate
167
Toilet Basin Counter Without Hole; ID: 760
200/each;
Two Holes in Granite. Each Rs 100. Initially included.
SrN
Title
Rate
168
Staircase Tread & Riser, Closed; ID: 1092
29/rft;
SrN
Title
Rate
169
Tiles/Granite/Stone, Closed; ID: 1093
12/sqft;
SrN
Title
Rate
170
Stone Fixing, Closed; ID: 1094
29/sqft;2.5%
SrN
Title
Rate
171
Kitchen Counter Latak ; ID: 1110
26/ft;2.5%
SrN
Title
Rate
172
Lift Electrical box granite cutting, Closed; ID: 1111
125/each;
SrN
Title
Rate
173
Tiles Cladding, Closed; ID: 1288
20.5/sqft;2.5%
SrN
Title
Rate
174
Chequre Tiles Fixing; ID: 1303
14/sqft;
Mainly used in basemen, Ramp and Stilt FLoor,
Wooden/UPVC Work
SrN
Title
Rate
175
Door Fitting with Shifting from Stilt; ID: 1289
620/pc;
SrN
Title
Rate
176
Door Fitting; ID: 480
600/door;
Rs 20 Extra for shifting door to flat.
SrN
Title
Rate
177
Door Frame; ID: 482
300/each;
Door Frame Fixing
SrN
Title
Rate
178
Door Shutter Repair; ID: 483
50/door;
SrN
Title
Rate
179
UPVC Door and Window Fitting; ID: 763
290/sqft;
SrN
Title
Rate
180
Door Moulding; ID: 718
3/rft;
SrN
Title
Rate
181
Door Shutter Fixing Work ; ID: 721
500/each;